Step #1: CRI Inspection

CRI performed a free roof inspection for King Arthur Montessori Academy and found many problems. In addition to the leaks, hail and wind damage, some of the roofing systems were not installed correctly and were therefore not code compliant.

King Arthur Montessori Academy had a Modified Bitumen (Asphalt) roof for 10,922 square feet and shingles for 3,325 square feet. The Modified Bitumen roof system was installed straight onto the deck with no insulation in between, making the installation not code compliant.

King Arthur Montessori Academy Project Inspection

Step #2: CRI Recommendation

King Arthur Montessori Academy had many problem areas that needed immediate attention. 

Leaks were at risk of damaging their property inside the building and the lack of insulation on the deck was not only a code violation but roofs without proper insulation are more susceptible to fires, can cause a condensation build up or mold among a number of other problems.

Step #3: CRI Project Scope of Work

First, we removed all existing roofing materials down to the deck. Once we fully removed the roofing materials, we were able to see the full extent of the damage. Damaged decking was found in multiple areas, roof penetrations were not properly sealed, scuppers were not protected and the metal coping was not code compliant. These items were then added to our scope of work.

Once the underlayment was repaired, we installed Firestone 3.5” Polyisocyanurate Rigid Insulation and mechanically fastened it per the manufacturer’s specifications and building codes which included installing ¼” per foot tapered insulation crickets to divert water to drains. We then installed a 060 mil Thermoplastic Elastomer Polyolefin (TPO) to replace the existing roof system. We sealed all penetrations according to the industry’s highest standards.

We replaced the existing shingles with Owen’s Corning TruDef Duration shingles, added walk pads for membrane protection and installed new metal coping to replace their existing coping that wasn’t code compliant.

King Arthur Montessori Academy Project

Step #4: Integrity of CRI's Work

We are a GenFlex Certified Contractor. That means our clients receive workmanship to the highest industry standards and products that are built to last. Our Firestone 3.5” Polyisocyanurate Rigid Insulation came with a 20-year Firestone Red Shield Warranty.

Step #5: Project Completion - We're Not Done Until You Sign Off on the Job

We believe no project is done until our clients our 100% satisfied. We reviewed all upgrades with the project manager and informed them of their workmanship and material warrantees. We didn’t leave a trace! You would have had no idea a full roof construction team was on site. We be sure to thoroughly sweep your property for debris.

Does your business’ roof need a facelift? Don’t wait until there are leaks, schedule a free roof inspection and we’ll let you know if your roof is doing its job. We offer regular maintenance services, roof repairs and complete roof replacements. Commercial Roofing & Interiors is the experienced and trustworthy contractors you deserve.

Completion of Job